- 01
- Oct
For the safety of life, the accident plan for the sudden water shutdown of the induction melting furnace is a must-see!
For the safety of life, the accident plan for the sudden water shutdown of the induction melting furnace is a must-see!
The production water is stopped due to water supply line failure or other reasons. First of all, pay attention to the water inlet of the induction melting furnace control cabinet. The sewage pipe pumps water supply to the intermediate frequency control cabinet, and frequently checks the cooling water temperature during the smelting process to ensure that the furnace body and If the temperature of the cooling water in the control cabinet does not exceed 55°C, the smelting can be continued. The specific implementation measures are as follows:
1. The entire circulating water temperature has exceeded 55°C. If the water is stopped during the smelting process, the furnace power supply should be stopped and reported to the supervisor of the workshop, which will be coordinated by the workshop.
2. The water temperature does not exceed 55℃. Stop the water during the smelting process and continue smelting. After the furnace is finished, observe the change of the water temperature, and then report to the workshop supervisor and the workshop will coordinate and resolve.