- 29
- Mar
Installation requirements for intermediate frequency induction heating furnace
Installation requirements for intermediate frequency magetsi oyatsira moto
The user first provides a site map and some site requirements or technical parameters, and designs a detailed site installation layout; equipment requirements for the foundation: flat cement floor, no fixing; equipment should be placed as far as possible in a ventilated, sunny, and cool outdoor; user Responsible for equipment installation materials, required civil engineering and necessary tools, we come to the site to guide the installation and commissioning, and conduct on-site operation training. If users have special requirements, they can be negotiated by the supplier and the buyer when ordering.