- 09
- Feb
Precautions before the operation and commissioning of the chiller
Precautions before the operation and commissioning of the chladič
1. The operation and debugging must be established after the installation is completed, not before the installation of the freezer is completed. This is the first point.
2. The debugging before operation must be based on the circuit and power supply. After all, this is about safety, so it must be careful.
3. For the inspection of the power supply, the safety and applicability of the power supply should be checked. For the inspection of the circuit, it should be checked whether the circuit of the refrigerator is normal, whether it is dangerous, and whether it complies with relevant specifications, such as grounding, etc. The inspection of live lines is essential and indispensable.
4. After checking the circuit and power supply, the freezer itself should be checked. Including water pipelines, installation problems, etc., find problems and solve them in time.
5. Heat the lubricating oil. In order for the lubricating oil to play a lubricating role, the lubricating oil must be heated if the compressor can be normally lubricated by the refrigerated lubricating oil.