How to install vacuum atmosphere furnace
እንዴት እንደሚጫኑ የቫኪዩም ከባቢ አየር ምድጃ
Vacuum atmosphere furnaces are now used in many industrial manufacturing in the heating process. For the experimental resistance furnace, we should first understand the structure of the experimental resistance furnace before operating, so that we can have a better operation of the experimental resistance furnace and deal with it in time. Various situations.
1. The vacuum atmosphere furnace does not need special installation, it only needs to be placed on a flat ground or workbench. The controller should avoid vibration, and the location should not be too close to the electric furnace to prevent overheating and the electronic components can not work normally.
2. Before installing the vacuum atmosphere furnace, check whether it is damaged or incomplete due to transportation or other reasons. If it is complete, remove the dirt from the parts first, repair the defects found, and then install it.
3. Insert the thermocouple through the couple hole, and fill the gap between the couple hole and the thermocouple with asbestos rope to prevent heat loss.
4. Check whether the electric heating element of the vacuum atmosphere furnace is broken, cracked, severely bent, and falling out of the bricks.
5. Please refer to the wiring diagram in the controller manual to connect the power cord, electric furnace cord, and compensation wire.
6. After the wire is connected, please follow the program to bake the new vacuum furnace head before using it for the first time.