site logo

Installation requirements for induction heating furnace

Installation requirements for induction ማሞቂያ እቶን

Please provide the site map and some on-site requirements or technical parameters first, and our company will design a detailed site installation layout; the equipment requirements for the foundation: flat cement floor, no need to fix or slightly fix; induction heating furnace should be as far as possible Place it outdoors in a ventilated, sunny, and cool place; the user is responsible for the installation materials of the induction heating furnace, the required civil engineering and necessary tools, and we come to the site to guide the installation and commissioning, and conduct on-site operation training. If users have special requirements, they can be negotiated by the supplier and the buyer when ordering.