site logo

How does the induction heating equipment for railway spikes operate?

Как се прави индукционно отоплително оборудване for railway spikes operate?

1. For the safety of the operators, the operators must lay dry wooden boards or insulating rubber sheets on the operation site, and the operators wear insulating rubber shoes and insulating gloves.

2. Supply water to the equipment before starting the machine, and check that the water pressure of the equipment should be adjusted to between 1.6-1.8.

3. Turn on the air source switch for the air cooling of the speed measuring probe of the equipment

4. Blow off the oxide skin in the sensor before starting the machine

5. When starting up, first close the contactor switch, then open the transmission part switch, and adjust the counter time according to the work efficiency. Turn the power control button clockwise, then turn the IF start button clockwise, then slowly turn the power knob clockwise, the pointer of the frequency meter moves first, and you hear the normal whistle of the IF, indicating that the device has been started, and then pay attention to the process of boosting. The ratio of intermediate frequency voltage to DC voltage is kept around 1.5. The power knob has been turned to the required voltage value to load and heat

6. When shutting down, the material in the sensor should be drained out, and the cooling water of the equipment can be stopped after 15 minutes.