site logo

Installation and debugging of the inductor and magnetic yoke of the metal melting furnace

Installation and debugging of the inductor and magnetic yoke of the धातु पिघलने वाली भट्टी

The installation of the main power supply line, transformers, capacitors, reactors, various switch cabinets and control cabinets, main bus bars, power lines and control lines of the furnace should be carried out in accordance with the relevant regulations of the national industrial enterprise electrical design and installation, and special attention should be paid Is the following:

(1) Both ends of all control wires in the electrical equipment room should be marked with terminal numbers to facilitate inspection and maintenance. After the wiring is completed, check repeatedly and test the electrical actions to ensure that the actions of all electrical and interlocking devices are accurate.

(2) Before the inductor is connected to water, the insulation resistance of the inductor shall be checked and an L withstand voltage test shall be performed. If the sensor has been watered, you need to use compressed air to dry the water, and then perform the above test. Shengzhuang device should be able to withstand 2u-+1000 volts (but not less than 2000 volts) insulation withstand voltage test for 1 minute without flicker and breakdown. In the high voltage test, the voltage starts from 1/2 the specified value and increases to the maximum value within 10 seconds.

The insulation resistance between different induction coils and between the induction coil and the ground in the inductor should meet the following requirements: For those with a rated voltage below 1000 volts, use a 1000 volt shaker, and the insulation resistance value should not be less than 1 megohm; For those above 1000 volts, use a 2500 volt shaker, and the insulation resistance value is not less than 1000 ohms/volt. If the insulation resistance is found to be low, the inductor should be dried. It can be dried with the help of a heater placed in the furnace or blowing hot air. At this time, however, care should be taken to prevent local overheating that is harmful to the insulation.

(3) Each core bolt of the magnetic yoke should have good insulation to the silicon steel sheet and to the ground. When measured with a 1000 volt shaker, the insulation resistance value should not be lower than 1 megohm.

The furnace must be confirmed before it is put into operation: all signal systems are intact, the tilting limit switch is reliable when the furnace body is tilted to the maximum position, and the power supply, measuring instruments and control and protection systems are in normal conditions, and then the furnace is built and knotted. Operation test of sintering furnace lining.