How to install the mechanical part of the induction melting furnace?
The installation of the relau lebur induksi termasuk pemasangan badan relau, elektrik relau senget, meja operasi dan sistem air. Pemasangan mesti dijalankan mengikut urutan berikut:
1.1. General Rules for Installation
1.1.1. After the induction melting furnace is in place according to the provided floor plan, adjust the level and size to meet the requirements of the relevant drawings, then hang the anchor bolts, pour cement, and tighten the anchor bolts after curing.
1.1.2. After the furnace body, hydraulic device and console are installed, connect the external hydraulic pipeline.
1.1.3. Lakukan kerja yang baik dalam sambungan saluran paip antara paip air masuk dan keluar utama dan sumber air kilang.
1.1.4. Refer to the water system diagram for the connection of the inlet and outlet water pipes of each furnace body. In principle, each branch road should be equipped with a ball valve. In order to make each branch circuit relatively independent, the flow can be adjusted.
1.1.5. Sambungkan wayar pembumian badan relau, dan rintangan pembumian diperlukan kurang daripada 4Ω.
1.1.6. Connection of water and oil circuits between induction melting furnaces