site logo

Induction melting furnace repair first DC, then AC

Induction melting furnace repair first DC, then AC

During maintenance, the inspection of electronic circuits must first detect the static operating point of the DC loop, and then the dynamic operating point of the AC loop. Here, DC and AC refer to the DC loop and AC loop at all levels of the electronic circuit. These two loops are complementary to each other, and the AC loop can work normally only if the DC loop is normal.