- 25
- Apr
انڊڪشن پگھلڻ واري فرنس جي ڪارخاني جي چڪاس جون شيون ھيٺ ڏنل آھن
The factory inspection items of the induction melting furnace are as follows:
هڪ جي عام چڪاس شامل ڪرڻ پگھلڻ واريون acesتيون;
b. Detection of the assembly size of the induction melting furnace;
c. Inspection of the manufacturing quality of the induction coil of the induction melting furnace;
d. Measurement of the electrical gap between the induction coil and the furnace shell of the induction melting furnace;
e. Insulation resistance measurement of the induction coil of the induction melting furnace to the furnace shell;
f. Insulation withstand voltage test of induction melting furnace;
جي. وچولي فریکوئنسي بجلي جي فراهمي ۽ capacitor فريم جي اسيمبلي معيار معائنو؛
h. Inspection of the water system and hydraulic system of the induction melting furnace;
i. انڊڪشن پگھلڻ واري فرنسز لاءِ لوازمات جو معائنو، بشمول ماڊلز جي معائنو، وضاحتون، ۽ فيڪٽري سرٽيفڪيٽ؛
j. The scope of supply of the induction melting furnace, including the inspection of the integrity of the factory technical documents;
ڪ. انڊڪشن فرنس پيڪيج جي چڪاس.