site logo

How to install the mechanical part of the induction melting furnace

How to install the mechanical part of the induction melting furnace?

The installation of the kudonhedzwa kunyorera vira includes the installation of the furnace body, tilting furnace electrical, operating table, and water system. The installation must be carried out in the following order:

1.1. General Mitemo nokuda Installation

1.1.1. Mushure mekunge muchoto wekunyunguduka wavapo maererano nechirongwa chepasi chakapihwa, gadzirisa nhanho uye saizi kuti isangane nezvinodiwa zvemifananidzo inoenderana, wobva warembera mabhaudhi eanchor, dururira simende, uye simbisa mabhaudhi eanchor mushure mekurapa.

1.1.2. Mushure memuviri wechoto, hydraulic mudziyo uye koni yakaiswa, batanidza ekunze hydraulic pombi.

1.1.3. Ita basa rakanaka mukubatanidza pombi pakati pepombi huru yekupinza uye yekubuda mvura uye pombi yemvura yefekitori.

1.1.4. Refer to the water system diagram for the connection of the inlet and outlet water pipes of each furnace body. In principle, each branch road should be equipped with a ball valve. In order to make each branch circuit relatively independent, the flow can be adjusted.

1.1.5. Batanidza waya yekugadzika yemuviri wechoto, uye kuramba kwepasi kunodiwa kuve kushoma pane 4Ω.

1.1.6. Kubatanidzwa kwemvura nemafuta maseketi pakati pe induction melting furnaces