- 06
- May
Emergency measures for water leakage in the coil of the induction melting furnace
Emergency measures for water leakage in the coil of the induksi tungku lebur
Emergency measures for leakage in the induction melting furnace and water seepage in the coil:
① Cut off the main power supply (at the same time, the class leader informs the dispatcher, workshop director, and class leader). To
②Close the circulating water inlet valve to prevent molten iron from leaking out and exploding when exposed to water. To
③Pour molten iron into the emergency bunker. To
④The production team assisted in blowing the furnace with air ducts to reduce the furnace temperature, and arranged for personnel to use fire extinguishers to extinguish the open flame at the bottom of the furnace. To
⑤ Re-circulate water, cool the coil, and place a bucket to catch the water at the coil’s water seepage position.