site logo

Preparation for steelmaking in induction melting furnace

Preparation for steelmaking in induction melting furnace

1. When preparing for steelmaking, the preliminary inspection work should not be ignored. You must first understand the condition of the furnace lining, whether the production tools are complete, and whether the induction melting furnace panel is normal.

2. Every two furnace bases are a set, and the necessary products such as ferrosilicon, medium manganese, synthetic slag, heat preservation agent, etc. must be prepared in place and placed in the middle of the furnace.

3. The steel material must be in place, and the furnace cannot be started if the steel material is not fully prepared.

4. Pay attention to the insulation rubber bedding of the induction melting furnace, and it is strictly forbidden to leave any gaps.