How to configure the cooling pipeline of the metal melting furnace?
How to configure the cooling pipeline of the metal melting furnace?
The cooling water system of the metal melting furnace should be equipped with a water separator, a return water tank and a spare water tank to ensure the normal water supply and return water for the cooling of the metal melting furnace. Valves, pressure gauges, etc. must be installed at the inlet and outlet of the water separator. The number and diameter of the outlet pipes of the water separator are determined by the frequency conversion device of the metal melting furnace and the cooling water circuit of the induction coil. The water separator of the metal melting furnace should be equipped with a drain pipe to adjust the water pressure. The outlet pipe of the return tank should have a larger diameter to ensure the smooth flow of the return water. In order to ensure the safe use of metal melting furnace equipment, the cooling water system should implement centralized water supply and return water. The cooling water circuit of the metal melting furnace should be equipped with a water pressure alarm device and a water stop warning device to prevent equipment accidents caused by insufficient water pressure or water interruption.
The inlet temperature, outlet temperature, water pressure and flow rate of the cooling water of the metal melting furnace must meet the design regulations. The cooling water system of the metal melting furnace is equipped with various sensors to monitor the relevant parameters of the cooling water. When the cooling water parameter is abnormal or exceeds the set value, it will alarm or stop the operation of the equipment. The cooling water pump station of the metal melting furnace must be equipped with two main water pumps of the same specification (one used and one standby), and must be equipped with an emergency cooling water system