- 27
- Jan
The difference of round steel heating equipment
The difference of round steel heating equipment:
1. The heating purpose of round steel before forging is round steel forging. Therefore, the length of round steel is generally less than 1m, mostly between 100mm and 500mm. It is combined with automatic feeder, temperature measurement and sorting, manipulator and automatic control system, and installed in forging. The heating production line forms an intelligent and automated round steel heating. The heating is the overall heating of the round steel or the partial heating of the ends.
2. The heating purpose of round steel rolling is round steel rolling. Therefore, the length of the round steel is greater than 1m, and even the length is 6-12m. The clamping rod feeding method is adopted to make the long steel rod enter the rolling mill after continuous heating, and the heated round steel Rolled into steel balls or profiles.
3. The purpose of round steel quenching and tempering heating is round steel heat treatment to change the material properties of round steel. Generally, the round steel is quenched by the water spray system after being heated to 1000 degrees, and tempered after being heated to about 450 degrees.