- 17
- May
How to choose a 1 T induction melting furnace?
How to choose a 1 T induction melting furnace?
1 T energy-saving 感應熔煉爐 is a commonly used scrap steel melting furnace, which is mostly used in the foundry industry to smelt scrap steel and then pour it into castings. Summarize the parameters of 1 T energy-saving induction melting furnace to share with you.
組成 | Induction melting furnace parameters | KGPS-1T-380V induction melting furnace | KGPS-1T-575 Induction Melting Furnace |
電櫃 | Rated phase advance voltage | 380V, intermediate frequency output voltage (induction furnace) 750V | 575V, intermediate frequency output voltage (induction furnace) 1100V |
KK SCR | 1200A/1000V 8 (Xiangfan platform) | 1000A/1800V 8 (Xiangfan platform) | |
KP SCR | 1200A/1000V 6 (Xiangfan platform) | 1000A/2500V 6 (Xiangfan platform) | |
空氣開關 | 2000A/electric | 2000A/electric | |
Installed copper bar | 60mm X 5mm | ||
反應堆 | Copper tube diameter 16 mm, number of coils: 6 | Copper tube diameter 16 mm, number of coils: 8 | |
capacitor cabinet | 2000KF /750V 6 units (Xinanjiang) | 2000KF /1200V 8 sets (Xinanjiang) | |
爐 | 爐 | ||
furnace shell | 直徑910毫米高度1300毫米 | 直徑1100毫米高度1350毫米 | |
感應線圈內徑 | 660mm | 630mm | |
Induction coil number | 17圈 | 25圈 | |
Induction coil copper tube specifications | 25mm X 40mm X 4mm | 25mm X 30mm X 3mm | |
Induction melting furnaceFeatures | 1. The protection speed is fast, the thyristor is durable, the startup performance is good, the work is stable, and the operation is convenient. 2. Adopt large copper row installation machine to save electricity. 3. The furnace bottom heat dissipation ring is installed, the furnace bottom heats up small, the furnace bottom is durable, it is not easy to wear the furnace, and the furnace bottom loss is small; using a booster circuit, the two voltages of the electric furnace can reach 1800V (2 times the output voltage of the electric cabinet), Water cable, induction coil loss is small with ZS11-750KW electric furnace transformer (in line with home standards, Haishan approved), under normal circumstances, 1 T molten iron can be melted in 60 minutes, and the electricity used for melting T molten iron is about 700 degrees. |
1. The protection speed is fast, the thyristor is durable, the startup performance is good, the work is stable, and the operation is convenient. 2. Adopt large copper row installation machine to save electricity. 3. The furnace bottom heat dissipation ring is installed, the furnace bottom heats up small, the furnace bottom is durable, it is not easy to wear the furnace, and the furnace bottom loss is small; using a booster circuit, the two voltages of the electric furnace can reach 2600V (2 times the output voltage of the electric cabinet), The loss of water cable and induction coil is small; the loss of 700V phase-in voltage, reactor, installed copper bar, and phase-in cable is small. Equipped with ZS11-750KW transformer for electric furnace (according to home standards and approved by Haishan), under normal circumstances, 1 T molten iron can be melted in 50 minutes, and the electricity used for melting T molten iron is about 600 degrees. |