Summary table of maintenance points for induction melting furnace
Summary table of maintenance points for ເຕົາເຜົາຜະຫຼິດໄຟຟ້າ
ບໍາລຸງຮັກສາແລະສ້ອມແປງລາຍການ | Maintenance and repair content | Maintenance time and frequency | ຂໍ້ສັງເກດ | |
ນ້ໍາ
ຄວາມກົດດັນ
Pack
ທີ່ກໍານົດໄວ້ |
Pump |
Check whether the noise of the pump is abnormal | 1 time / week | ເມື່ອປັ໊ມມີສຽງດັງ, ມີເຫດຜົນຕໍ່ໄປນີ້:
(1) Air is sucked in by the suction filter (2) The suction side of the pump sucks in air |
Pressure regulating valve |
(1) When there is a time lag from the start of the pump to when the pressure rises and when the noise of the pressure regulating valve increases , disassemble the pressure regulating valve for cleaning
(2) When the tilting speed is too slow , increase the setting of the pressure regulating valve within the maximum operating pressure range of the device . The set pressure does not rise , remove it for cleaning |
|||
ການກັ່ນຕອງທໍ່ |
Disassemble the filter for cleaning
ພາກສ່ວນແລກປ່ຽນ |
The first time is one month , and then one time /3 months
1 time /2 years |
||
ທໍ່
ເຄື່ອງປັ່ນໄຟສຸກເສີນ ຈັກປ້ ຳ ນ້ ຳ ມັນ ປັpumpມມື |
Visually check for oil leaks on the piping
Prevent rust , start the engine pump Check according to the attached check book Take measures to prevent rust and start the hand pump |
1 time / month
1 time / month
1 time / month |
||
Blower |
ສາຍແອວພັດລົມ |
ບໍ່ວ່າສາຍແອວແມ່ນ slack
Whether the belt is broken |
ຄັ້ງທໍາອິດແມ່ນຫນຶ່ງເດືອນ, ຫຼັງຈາກນັ້ນ
1 time /6 months |
|
ເຄື່ອງກອງອາກາດ | ກວດເບິ່ງສະຖານະສູນຍາກາດດ້ວຍສາຍຕາ ແລະເຮັດຄວາມສະອາດດ້ວຍອາກາດອັດແໜ້ນໃນກອງປະຊຸມ | 1 time / month
|
||
Noise, vibration | Is the noise and vibration of the blower different from usual? | 1 time / week | ||
Add lubricating oil | Blower bearing | 1 time /3 months | ||
ວົງຈອນນ້ໍາເຢັນ |
ປ້ ຳ ນ້ ຳ ເຢັນ |
(1) Bearing temperature and motor housing temperature
(2) When there is water leakage in the pump bearing , reinforce the bearing (3) Is the noise and vibration of the motor and pump different from usual? (4) After a long period of operation , or when the operation is stopped in winter or at night , the remaining water should be removed (5) Wear of gland sealing electricity |
1 time / week
1 time / month 1 time / month
1 time /1.5 ~2 years |
|
Tower ເຢັນ |
(1) ການອຸດຕັນຂອງ nozzle ໄດ້
(2) The dirt of the filter : Clean or replace when the contamination is serious (3) Whether the fan belt is loose
(4) Add lubricating oil to fan bearings |
Initially for a check once a month , after 1 times / 3 months 1 time /3 months |
Check whether the nozzle is blocked from the inspection window during operation | |
ບໍາລຸງຮັກສາແລະສ້ອມແປງລາຍການ | Maintenance and repair content | Maintenance time and frequency | ຂໍ້ສັງເກດ | |
ວົງຈອນນ້ໍາເຢັນ
|
ວົງຈອນນ້ໍາເຢັນ |
(1) ແມ່ນການໄຫຼຂອງເຄື່ອງວັດການໄຫຼທີ່ແຕກຕ່າງກັນຈາກປົກກະຕິ
(2) Clean the filter (3) Water pressure gauge Whether the alarm value is normal and the pressure indication is different from usual (4) Thermometer Whether the thermometer indicates normal ບໍ່ວ່າຈະເປັນຈຸດຕິດຕໍ່ຂອງປຸກແມ່ນຜິດປົກກະຕິ (5) Piping Whether the piping is leaking |
1 ເທື່ອ/ມື້
1 time /3 months 1 time / week
1 time / month 1 time / week
1 ເທື່ອ/ມື້ |
|
Emergency equipment |
(1) ປໍ້ານໍ້າມັນ
Run once a week , one time is half an hour (2) ເຄື່ອງຈັກນໍ້າມັນແອັດຊັງຖືກກວດກາຕາມປື້ມກວດກາທີ່ຕິດຄັດມາ (3) Emergency solenoid valve |
1 time / week
1 ເທື່ອ/ມື້ |
||
ອຸປະກອນປຸກ furnace ຮົ່ວ | Electrode lead wire inspection | (1) Is the electrode lead wire connection normal?
(2) Is the electrode lead wire grounded? |
1 ເທື່ອ/ມື້ | ກວດເບິ່ງດ້ວຍໄມ້ທົດສອບ |
ກວດເຊັກ |
ໃນເວລາທີ່ການລົບ furnace ໄດ້:
Whether the coil is burnt out due to molten metal Whether there are bumps in the coil Whether the coil is damaged |
It is appropriate to fill in the coil insulation with asbestos plaster and the renewal period is 3 to 5 years. |