- 20
- Jun
Operation specification requirements for high frequency quenching equipment
Operation specification requirements for उच्च आवृत्ति शमन उपकरण
1. उच्च-फ्रिक्वेन्सी क्वेन्चिङ उपकरणका अपरेटरहरूले परीक्षा उत्तीर्ण गर्नुपर्छ र सञ्चालन गर्न अनुमति दिनु अघि अपरेशन प्रमाणपत्र प्राप्त गर्नुपर्छ। अपरेटर उपकरणको प्रदर्शन र संरचनासँग परिचित हुनुपर्छ, र सुरक्षा र शिफ्ट प्रणालीको पालना गर्नुपर्छ;
2. There must be more than two people to operate the high-frequency quenching equipment, and the person in charge of the operation must be designated;
3. When operating the high-frequency quenching equipment, check whether the protective shield is in good condition, and idle people are not allowed to enter during work to avoid danger;
4. Before working, check whether the contact of each part of the equipment is reliable, whether the quenching machine tool is running well, and whether the mechanical or hydraulic transmission is normal;
5. When preparing to turn on the water pump during work, check whether the cooling water pipes are smooth and whether the water pressure is between 1.2kg-2kg. Be careful not to touch the cooling water of the equipment with your hands;
6. The power transmission preheating is performed at the first stage, the filament is preheated for 30min-45min, and then the second stage is performed, and the filament is preheated for 15min. Close and continue to adjust the phase shifter to high voltage. After adding high frequency, hands are not allowed to touch the busbars and inductors;
7. Install the sensor, turn on the cooling water, and drain the workpiece before the sensor can be energized and heated, and no-load power transmission is strictly prohibited. When replacing the workpiece, the high frequency must be stopped. If the high frequency cannot be stopped, the high voltage should be cut off immediately or the emergency switch should be connected;
8. During the operation of the high-frequency quenching equipment, it should be noted that the positive flow and the powder flow are not allowed to exceed the specified value;
9. When working, all the doors should be closed. After the high voltage is closed, do not move to the back of the machine at will, and it is strictly forbidden to open the door;
10. यदि उच्च-फ्रिक्वेन्सी शमन गर्ने उपकरणको काम गर्ने प्रक्रियामा असामान्य घटनाहरू भेटिएमा, उच्च भोल्टेज पहिले काट्नु पर्छ, र त्यसपछि त्रुटिहरू विश्लेषण र हटाउनु पर्छ।
11. कोठालाई शमन गर्ने क्रममा उत्सर्जित फ्लु ग्यास र फोहोर ग्यास हटाउन र वातावरणको सुरक्षा गर्न भेन्टिलेसन उपकरणले सुसज्जित हुनुपर्छ। भित्री तापमान 15-35 डिग्री सेल्सियस मा नियन्त्रण गर्नुपर्छ।
12. काम गरिसकेपछि, पहिले एनोड भोल्टेज विच्छेद गर्नुहोस्, त्यसपछि फिलामेन्ट पावर सप्लाई काट्नुहोस्, र 15 मिनेट-25 मिनेटको लागि पानी आपूर्ति जारी राख्नुहोस्, ताकि इलेक्ट्रोनिक ट्यूब पूर्ण रूपमा चिसो होस्, र त्यसपछि सफा गर्नुहोस् र उपकरण जाँच गर्नुहोस्, यसलाई सफा राख्नुहोस् र बिजुलीका कम्पोनेन्टहरू डिस्चार्ज हुन र भत्कनबाट जोगाउन सुक्खा। सरसफाईको लागि ढोका खोल्दा पहिले एनोड, ग्रिड, क्यापेसिटर आदि डिस्चार्ज गर्नुहोस्।