- 22
- Sep
3T intermediate frequency melting furnace /2000KW equipment parameters
3T intermediate frequency melting furnace /2000KW equipment parameters
3T intermediate frequency melting furnace /2000KW equipment parameters : ( one electric and two furnaces in parallel )
project | Tsev | cov ntaub ntawv |
Hluav taws xob rauv hluav taws xob tsis | ||
Rated Capacity | t | 3.0 |
Qhov siab tshaj plaws kub | ° C | 1750 |
Hluav taws xob tsis | ||
Transformer thawj qhov hluav taws xob | KV | 10 |
Transformer theem ob qhov hluav taws xob | V | 660 |
Rated zog ntawm cov khoom siv hluav taws xob nruab nrab zaus | KW | 2000 |
zaus ua hauj lwm | Hz | 5 |
Kev pib ua tiav | 100% | |
Power factor (under rated power state) | % | 0.92 |
Txig tsis dhau | ||
Melting rate (cast iron national standard) | T / h | 3.2 |
Melting power consumption (cast iron national standard) | wh/t | 590 |
Cov suab nrov ua haujlwm | db | ≤85 |
Cov kaw lus dej txias | ||
Lub taub dej siab | MPa | Xyoo 0.2 – 0.3 |
Inlet dej kub | ° C | <35 ℃ |
Qhov hluav taws xob kub | ° C | <55 ℃ |