- 24
- Jan
Method of buffering modulating wave melting aluminum furnace
Method of buffering modulating wave melting aluminum furnace
The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.
The oven process is as follows (see crucible maintenance process for details):
A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;
ለ. የሙቀት መጠኑን ከ 100 ℃ እስከ 200 ℃ ከፍ ያድርጉት ፣ የሙቀቱ ጅረት 20A ነው ፣ ባዶው ድስት እስከ 200 ℃ ያለ ክዳን ይሞቃል ፣ እና የሙቀት መጠኑ ለ 2 ሰ;
C. 200℃ ወደ 300 ℃ ያሳድጉ ፣ የአሁኑን 30A ያሞቁ ፣ ባዶው ክሬዲት እስከ 300 ℃ ያለ ክዳን ይሞቃል ፣ ለ 1 ሰ ቋሚ የሙቀት መጠን;
መ የሙቀት መጠኑን ከ 300 ዲግሪ ሴንቲግሬድ እስከ 800 ዲግሪ ሴንቲ ግሬድ ከፍ ያድርጉት, ሙሉ ጭነት ይሞቁ, ባዶውን ክራንቻ ይሸፍኑ እና እስከ 800 ° ሴ ድረስ ይሞቁ, የሙቀት መጠኑን ለ 1 ሰ;
When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.
https://songdaokeji.cn/category/products/induction-melting-furnace
https://songdaokeji.cn/category/blog/induction-melting-furnace-related-information
ስልክ : 8618037961302