Method of buffering modulating wave melting aluminum furnace

Method of buffering modulating wave melting aluminum furnace

The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.

The oven process is as follows (see crucible maintenance process for details):

A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;

B. Germahiya ji 100℃ berbi 200℃ bilind bikin, herikîna germkirinê 20A ye, potikê vala bêyî qapax heya 200℃ tê germ kirin, û germahî 2h domdar e;

C. 200 ℃ rakin 300 ℃, germkirina niha 30A, kevçîya vala heta 300℃ bê kapak tê germ kirin, germahiya domdar ji bo 1h;

D. Germahiya ji 300°C berbi 800°C bilind bikin, bi bargiraniya tam germ bikin, qalika vala vekin ü heta 800°C germ bikin, germahiye 1h sabit biminin;

When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.