- 24
- Jan
Method of buffering modulating wave melting aluminum furnace
Method of buffering modulating wave melting aluminum furnace
The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.
The oven process is as follows (see crucible maintenance process for details):
A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;
B. گرمي پد کي 100 ℃ کان 200 ℃ تائين وڌايو، گرميء جو موجوده 20A آھي، خالي برتن کي 200 ℃ تي بغير بغير 2 ℃ تائين گرم ڪيو ويندو آھي، ۽ گرمي پد XNUMXh لاء مسلسل آھي؛
C. 200 ℃ کي 300 ℃ تائين وڌايو، موجوده 30A کي گرم ڪرڻ، خالي ڪرسيبل کي 300 ℃ تي بغير ڍڪڻ، مسلسل گرمي پد 1h تائين؛
D. گرمي پد کي 300 ° C کان 800 ° C تائين وڌايو، پوري لوڊ تي گرم ڪريو، خالي ڪرسيبل کي ڍڪيو ۽ 800 ° C تائين گرمي ڪريو، گرمي پد کي 1h لاء مسلسل رکو؛
When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.
https://songdaokeji.cn/category/products/induction-melting-furnace
https://songdaokeji.cn/category/blog/induction-melting-furnace-related-information
ٽيليفون: 8618037961302