Method of buffering modulating wave melting aluminum furnace
Method of buffering modulating wave melting aluminum furnace
The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.
The oven process is as follows (see crucible maintenance process for details):
A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;
B. Aumente a temperatura de 100 ℃ para 200 ℃, a corrente de aquecimento é 20A, a panela vazia é aquecida a 200 ℃ sem tampa e a temperatura é constante por 2h;
C. Aumente 200 ℃ a 300 ℃, corrente de aquecimento 30A, o cadinho vazio é aquecido a 300 ℃ sem tampa, temperatura constante por 1h;
D. Elevar a temperatura de 300 ° C para 800 ° C, aquecer a plena carga, cobrir o cadinho vazio e aquecer até 800 ° C, manter a temperatura constante por 1h;
When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.