- 18
- Oct
TABLEAU DE RÉPARTITION DES ÉTENDUES DE LA FOURNITURE POUR FOUR DE CHAUFFAGE À INDUCTION EN TUBE D’ACIER
TABLEAU DE RÉPARTITION DES ÉTENDUE DE LA FOURNITURE POUR FOUR DE CHAUFFAGE À INDUCTION EN TUBE D’ACIER
| NUMÉRO DE SÉRIE | CATÉGORIE | NOM DU PROJET | BD | DD | LA FOURNITURE | REMARQUE |
|---|---|---|---|---|---|---|
| 1 |
AMÉNAGEMENT DES BUS |
EXIGENCES DU PROCESSUS DE TUYAUTERIE EN ACIER | B | B | ||
| 2 | TAILLE DU FOUR À INDUCTION À TUBE D’ACIER | S | S | |||
| 3 | EXIGENCES D’INTERFACE DU FOUR DE CHAUFFAGE À INDUCTION EN TUBE D’ACIER | S | S | |||
| 4 | TRAVAUX CIVILS | S | B | |||
| 5 | INTERFACE DE FOUR DE CHAUFFAGE À INDUCTION EN TUBE D’ACIER | SB | SB | |||
| 6 | MECHANICAL PART | ÉQUIPEMENT FOND DE PLANCHE | S | B | B | |
| 7 | ÉLÉMENT DE DÉTECTION ET SUPPORT DE MONTAGE | S | S | S | ||
| 8 |
ÉLECTRICITÉ ET CONTRLE |
STRUCTURE DU SYSTÈME ÉLECTRIQUE | S | S | S | |
| 9 | ALIMENTATION ENTIÈRE DE LA MACHINE | S | B | B | ||
| 10 | DISTRIBUTION D’ALIMENTATION INTERNE | S | S | S | ||
| 11 | SYSTÈME DE CONTRÔLE | S | S | S | ||
| 12 | ARMOIRE DE COMMANDE ÉLECTRIQUE, CONSOLE, ETC. | S | S | S | ||
| 13 | SYSTÈMES DE DÉTECTION | S | S | S | ||
| 14 | SYSTÈME DE SURVEILLANCE DANS LE FOUR DE CHAUFFAGE À INDUCTION EN TUBE D’ACIER | S | S | S | ||
| 15 | INTERFACE DE COMMUNICATION | SB | S | S | ||
| 16 | ÉQUIPEMENT DE COMMUNICATION INTERNE | S | S | S | ||
| 17 |
LOGICIEL |
PROGRAMMING SOFTWARE | S | S | S | |
| 18 | LOGICIEL CPL | S | S | S | ||
| 19 | LOGICIEL DE CONTRLE INFORMATIQUE | S | S | S | ||
| 20 | LOGICIEL DE GESTION INFORMATIQUE | S | S | S | ||
| VINGT-ET-UN | LOGICIEL DE COMMUNICATION INTERNE DE L’APPAREIL | S | S | S | ||
| VINGT-DEUX |
INSTALLATION DE FOURNAISE À INDUCTION À TUBE D’ACIER |
INSTRUCTIONS D’INSTALLATION | S | |||
| VINGT TROIS | INSTALLATION MÉCANIQUE | B | ||||
| VINGT QUATRE | INSTALLATION ÉLECTRIQUE | B | ||||
| 25 | VÉRIFICATION DE L’INSTALLATION | SB | ||||
| 26 | RÉGLAGE DE LA FOURNAISE À INDUCTION À TUBE D’ACIER | SB | ||||
| 27 | DÉBOGAGE | DÉBOGAGE DU PROGRAMME | S | |||
| 28 | COMMISSIONING | B | ||||
| 29 | RÉGLAGE DE L’ÉTALONNAGE | S |

