DISTRIBUTION TABLE OF SCOPE OF SUPPLY FOR STEEL TUBE INDUCTION HEATING FURNACE
JADUAL PENGAGIHAN SKOP PEMBEKALAN UNTUK FURNACE PANAS INDUCTION TUBE STEEL
NOMBOR SIRI | Kategori | NAMA PROJEK | BD | DD | BEKALAN | REMARK |
---|---|---|---|---|---|---|
1 |
BAYARAN BUS |
KEPERLUAN PROSES Pipa BAJA | B | B | ||
2 | UKURAN FURNACE HEATING INDUCTION TUBE STEEL | S | S | |||
3 | STEEL PIPE INDUCTION HEATING FURNACE INTERFACE REQUIREMENTS | S | S | |||
4 | KERJA SIVIL | S | B | |||
5 | INTERFACE FURNACE HEATING INDUCTION STEEL TUBE | SB | SB | |||
6 | MECHANICAL PART | LATAR BELAKANG PERALATAN | S | B | B | |
7 | ELEMEN PENETAPAN DAN PAKAIAN PEMASANGAN | S | S | S | ||
8 |
ELECTRICAL AND CONTROL |
STRUKTUR SISTEM ELEKTRIK | S | S | S | |
9 | BEKALAN KUASA MESIN SELURUH | S | B | B | ||
10 | PEMBAHAGIAN KUASA DALAMAN | S | S | S | ||
11 | SISTEM KAWALAN | S | S | S | ||
12 | KABINET KAWALAN ELEKTRIK, KONSOL, DLL. | S | S | S | ||
13 | SISTEM PENETAPAN | S | S | S | ||
14 | SISTEM PEMANTAUAN DALAM BAJA PEMANASAN INDUKSI TUBE BAJA | S | S | S | ||
15 | INTERFASI KOMUNIKASI | SB | S | S | ||
16 | PERALATAN KOMUNIKASI DALAMAN | S | S | S | ||
17 |
PERISIAN |
PROGRAMMING SOFTWARE | S | S | S | |
18 | PERISIAN PLC | S | S | S | ||
19 | PERISIAN KAWALAN MASTER KOMPUTER | S | S | S | ||
20 | PERISIAN PENGURUSAN KOMPUTER | S | S | S | ||
DUA PULUH SATU | PERISIAN KOMUNIKASI DALAMAN PERANTI | S | S | S | ||
DUA PULUH DUA |
PEMASANGAN FURNACE HEATING INDUCTION TUBE TUBE |
ARAHAN PEMASANGAN | S | |||
DUA PULUH TIGA | PEMASANGAN MEKANIKAL | B | ||||
DUA PULUH EMPAT | PEMASANGAN ELEKTRIK | B | ||||
25 | SEMAK PEMASANGAN | SB | ||||
26 | PENYELESAIAN FURNACE PEMANASAN INDUKSI STEEL TUBE TUBE | SB | ||||
27 | MENGHILANGKAN | PERBINCANGAN PROGRAM | S | |||
28 | KOMISYEN | B | ||||
29 | PENYELESAIAN KALIBRASI | S |