- 18
- Oct
Tabel Distribusi SCOPE SUPPLY KANGGO WIS PANAS INDUKSI TUBE
KABEH KABEH SCOPE SUPPLY KANGGO WIS PANAS INDUKSI Waja
Nomer SERial | BABAGAN | NAMA PROYEK | BD | DD | SUPPLY | TETEMBUNGANE |
---|---|---|---|---|---|---|
1 |
BUS LAYOUT |
Kebutuhan PROSES PIPI Waja | B | B | ||
2 | UKURAN TUBE INDUCTION HEARING FURNACE SIZE | S | S | |||
3 | Kebutuhan INFORMASI FURNACE FURNACE INTERNASIONAL PIPI Waja | S | S | |||
4 | KARYA SIVIL | S | B | |||
5 | INTERFACE FURNACE FURNACE INDUSTRIING WISI Waja | SB | SB | |||
6 | BAGIAN MEKANIKAL | BACKPLANE EQUIPMEN | S | B | B | |
7 | ELEMEN DETEKSI LAN BRACKET MOUNTING | S | S | S | ||
8 |
LISTRIK LAN KONTROL |
STRUKTUR SISTEM LISTRIK | S | S | S | |
9 | SUPPLY MESIN KABEH | S | B | B | ||
10 | DISTRIBUSI DAYA INTERNAL | S | S | S | ||
11 | SISTEM KONTROL | S | S | S | ||
12 | KABINET KONTROL LISTRIK, CONSOLE, ETC. | S | S | S | ||
13 | SISTEM DETEKSI | S | S | S | ||
14 | SISTEM PEMANTAUAN ING WESI PANAS INDUKSI TUBE STEEL | S | S | S | ||
15 | INTERFACE KOMUNIKASI | SB | S | S | ||
16 | PERALATAN KOMUNIKASI INTERNAL | S | S | S | ||
17 |
SOFTWARE |
SOFTWARE PROGRAMMING | S | S | S | |
18 | SOFTWARE PLC | S | S | S | ||
19 | SOFTWARE CONTROL MASTER KOMPUTER | S | S | S | ||
20 | SOFTWARE MANAJEMEN KOMPUTER | S | S | S | ||
SI PULU SATU | SOFTWARE KOMUNIKASI INTERNAL DEVICE | S | S | S | ||
Rong Puluh Loro |
INSTALASI PANAS PEMANASAN INDUKSI INGGRIS |
INSTRUKSI INSTALASI | S | |||
Telung Puluh Telung | INSTALASI MEKANIKAL | B | ||||
PING PULUT PULU | INSTALASI LISTRIK | B | ||||
25 | Priksa INSTALASI | SB | ||||
26 | STIEL TUBE INDUCTION HEATING FURNACE ADJUSTMENT | SB | ||||
27 | DEBUGGING | PROGRAM DEBUGGING | S | |||
28 | KOMISI | B | ||||
29 | ADJUSMEN KALIBRASI | S |