Method of buffering modulating wave melting aluminum furnace
Method of buffering modulating wave melting aluminum furnace
The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.
The oven process is as follows (see crucible maintenance process for details):
A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;
B、升溫100℃至200℃,加熱電流20A,空鍋不加蓋加熱至200℃,恆溫2h;
C. 升溫200℃至300℃,加熱電流30A,空坩堝無蓋加熱至300℃,恆溫1h;
D、從300℃升溫至800℃,滿負荷加熱,蓋上空坩堝升溫至800℃,保溫1h;
When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.
https://songdaokeji.cn/category/products/induction-melting-furnace
https://songdaokeji.cn/category/blog/induction-melting-furnace-related-information