site logo

200KG tanuru ya kiwango cha kati cha shaba

200KG tanuru ya kiwango cha kati cha shaba

First, 200KG medium frequency copper melting furnace technical specifications and requirements:

1) , smelting material: scrap copper material, the primary capacity is less than 10-200 kg.

2) , smelting : melting temperature of 1300 degrees, melting time of 50-60 minutes.

3) , 坩埚: silicon carbide crucible (outer high wall thickness 300mm upper mouth outer diameter 220 mm) service life 70-80 times.

Second, 200KG medium frequency copper melting furnace technology solutions and equipment selection

According to the technical requirements of the purchaser, the 200KG medium frequency copper melting furnace TXZ-160KW can be used . The process is as follows:

Nyenzo za chuma huwekwa kwa mikono kwenye kisu cha tanuru ya kutupa.

Baada ya chuma kuyeyuka kwenye kioevu, mwili wa tanuru unadhibitiwa kwa umeme na kioevu hutiwa kwenye ukungu.

Third , 200KG medium frequency copper melting furnace TXZ-160kw quotation: ¥ 70000 yuan (excluding circulating cooling system)

1, the frequency induction heating machine (including power capacitors + box + 200 kg molten copper overturned electric furnace)

Nne, maelezo ya kumbukumbu ya picha: IF usambazaji wa umeme + capacitor ya fidia + tanuru ya kutupa umeme

C: \ Nyaraka na Mipangilio \ Msimamizi \ 桌面 \ 电动 炉 .jpg 电动 炉

V. Main technical parameters of T XZ- 1 6 0 kw 200KG medium frequency copper melting furnace:

1, the maximum input power : 160 KW
2 , the output current 40-200 A

3, the output voltage: 70-550V ,

4, oscillation frequency : 1-20KHZ

5, input power : three-phase 380V ± 20% , 50 or 60HZ

6 , input power supply air requirements: 3 × 40 0A

7 , power supply volume (CM) : 47 wide × 95 high 85 long

8 , power weight: 135 KG

9, mzigo kiwango cha mwendelezo: 100% masaa 24, kazi inayoendelea

1 0, input power supply air requirements: 3 × 150A

11. Requirements for cooling water of medium frequency complete furnace: ≥0. 3 Mpa , ≥2 5 /Min

12. Medium frequency power supply cooling water requirements: ≥ 0.2Mpa ≥ 8 Min

13, power waterway: one into the water, three water

Sita, usanidi wa kiwango cha vifaa:

TX Z – 160kw high frequency induction heater configuration list
Namba ya Serial jina kitengo wingi Hotuba
1 Ugavi wa umeme wa masafa ya kati kituo cha 1 Standard
2 Sanduku la fidia la capacitor kituo cha 1      Standard
3 Copper melting 200kgelectric overturningfurnace body kituo cha 1 Standard
4 Gawanya kebo ya unganisho Moja 1 Standard
5 Pato la maji kilichopozwa kebo kuweka 1 Standard
6 sanduku la kudhibiti Moja 1 Standard

Saba, vifaa vya mashine vilivyowekwa na mteja (mfumo wa kupoza mzunguko):

1. Kubadilisha hewa ya awamu tatu 400A Moja

2. Uunganisho wa nguvu cable rahisi 90 mm2 mita chache

3. Mnara wa kupoza tani 30 1;

4. Pump 3.0kw / kichwa mita 30-50 seti 1;

5, vifaa ghuba na plagi mabomba ya maji: shinikizo la juu kuimarishwa bomba la maji kipenyo cha nje 16 mm, kipenyo cha ndani 12 mm mita kadhaa

6, gombo la pampu ya maji na bomba la maji: 1 inchi (kipenyo cha ndani 25 mm) ndani ya waya shinikizo la shinikizo kraftigare mita kadhaa

Eight , 200KG medium frequency copper melting furnace use operation steps :

1, unganisho la umeme: ufikiaji wa laini ya kujitolea ya usambazaji wa umeme, mtawaliwa, kubadili awamu ya tatu ya hewa. Kisha unganisha waya wa ardhi. (Kumbuka kuwa nguvu ya umeme ya awamu tatu inapaswa kufikia matumizi ya vifaa, na unene wa waya utumiwe kulingana na maagizo)

2, maji: (kulingana na wakati wa kufanya kazi na mzigo wa kazi) chagua mfumo wa maji baridi ili kufanikisha mzunguko wa maji.

3, kupitia maji: fungua njia ya maji, na angalia vifaa kila maji ili kuona ikiwa kuna mtiririko wa maji, mtiririko na shinikizo ni kawaida.

4, nguvu: kwanza fungua swichi ya kudhibiti nguvu, kisha fungua swichi ya hewa nyuma ya mashine, halafu washa swichi ya umeme kwenye jopo la kudhibiti.

5. Anza: Nguvu ya joto ya potentiometer inapaswa kurekebishwa kwa kiwango cha chini kabla ya kuanza tanuru ya kwanza. Baada ya kuanza, joto linapaswa kubadilishwa kwa nguvu inayohitajika. Bonyeza kitufe cha kuanza kuanza mashine. Kwa wakati huu, kiashiria cha kupokanzwa kwenye jopo kinawaka, na sauti ya haraka ya operesheni ya kawaida na taa ya kazi huangaza wakati huo huo.
6. Uchunguzi na kipimo cha joto: Wakati wa mchakato wa kupokanzwa, imedhamiriwa haswa na njia za kuona kuamua wakati wa kukomesha.

7. Kuzima: Zima, kifaa cha kudhibiti kinazima kwanza, kisha uzime swichi kuu ya nje ya nguvu, halafu ichelewe hadi saa 1 baada ya joto la tanuru kushuka; kisha vifaa vya maji baridi, vifaa vya joto ndani ya mashine na kuwezesha coil ya induction Joto hutolewa.
8. Katika eneo ambalo ni rahisi kufungia wakati wa baridi, inapaswa kuzingatiwa kuwa kila baada ya matumizi, hewa iliyoshinikizwa inapaswa kutumiwa kulipua maji ndani na nje ya vifaa kuzuia maji kutokana na ngozi za ndani na mabomba ya maji ndani vifaa.

Nine, customer molten copper smelting scene pictures:

20140708_142021