site logo

බොයිලේරුවේ පරාවර්තක ගඩොල් සාදා ගන්නේ කෙසේද?

පරාවර්තක ගඩොල් සාදා ගන්නේ කෙසේද බොයිලේරු?

1. The construction steps are carried out in accordance with the principle of from bottom to top and from inside to outside. The lower part of the upper drum and the convection tube bundle interval flame plate are poured from top to bottom.

2. The furnace wall has high air-tightness requirements, and the fullness of ash joints: red bricks are not less than 85%; refractory bricks are not less than 90%. The squeezing method is used for red brick masonry, and the scraping method is used for refractory brick masonry.

3. Masonry of furnace bottom:

(1) උදුන පතුළ තැබීමට පෙර, අත්තිවාරම සමතලා කළ යුතු අතර, උදුන පතුලේ ස්පර්ශ වන අවට සෘජු බිත්ති මුලින්ම ගොඩනගා ගත යුතු අතර, උදුන පතුලේ මතුපිටට වඩා උස ආසන්න වශයෙන් වැඩි විය යුතුය. එවිට උදුන පතුලේ තිරස් රේඛාව (බහු-ස්ථර පෙදරේරු අවස්ථාවක, ස්ථර ගණන සමඟ) සෘජු බිත්තියේ උදුන පතුලේ ඉදි කිරීමට පෙර සලකුණු කරන්න.

(2) When the furnace bottom is composed of multiple layers of bricks, the masonry should be carried out layer by layer, with the upper and lower layers and the same layer of bricks staggered, and the long sides of the most surface layer bricks are perpendicular to the flow direction of slag or gas.

(3) In high-temperature areas and furnace bottoms that often need to be overhauled, an expansion gap should be left at the contact between the furnace bottom and the straight wall, and asbestos rope or pad asbestos board should be embedded in the gap.

4. Masonry of ash bucket (including inclined wall):

(1) අළු බාල්දිය තැනීමට පෙර, චිත්‍රවලට අනුව තිරස් මධ්‍ය රේඛාව ප්‍රථමයෙන් සොයාගෙන, තිරස් මැද රේඛාව භාවිතා කර එක් එක් අළු බාල්දියක කල්පවත්නා මධ්‍ය රේඛාව සහ ඝන ස්ලැග්හි ඉදිරිපස සහ පසුපස සෘජු බිත්තිවල පිටත දාර සොයා ගන්න. බාල්දිය, පසුව දෙපසම උන්නතාංශය පදනම් කරන්න. අළු ආප්පයේ පතුලට සිරස් මැද රේඛාව උත්පතන කරන්න, සහ අළු ආප්පයේ පතුලේ ප්‍රමාණය සකසන්න. සිරස් සහායක රේඛාව තැබීමෙන් පසු, නිපදවන ලද ත්රිකෝණ ආකෘතිය භාවිතා කරන්න (ඇඳීමෙහි ඇති ආනත බිත්තියේ බෑවුම අනුව සාදා ඇත), සහ අත්තිවාරමේ ස්ථාවරයේ දෙපැත්තේ ඇති ආනත බිත්තියේ පැති රේඛාව අඳින්න. මතුපිට. ආනත බිත්තියේ පතුලේ ත්රිකෝණාකාර පසුබෑම (රූපය 1 හි පෙන්වා ඇති පරිදි) සහ සෘජු බිත්තිය මට්ටම් කිරීම සඳහා පරාවර්තක කොන්ක්රීට් එකම ද්රව්ය භාවිතා කරන්න. සිරස්, තිරස් සහ නැඹුරුවන බිත්තිවල සන්ධිස්ථානයේ ත්රිකෝණාකාර පසුබෑම ද එම ද්රව්යයේ පරාවර්තක කොන්ක්රීට් වලින් වත් කළ යුතුය. පෙදරේරු බෑවුම් සහිත බිත්ති වෙත යන්න.

(2) When building the ash bucket, first build the horizontal and then the vertical; when the inclined wall and the straight wall are formed, build the straight wall first and then the inclined wall.

(3) When there is foundation support on the back of the inclined wall, the mortar on the contact surface between the bricks and the foundation should be full; Once cinder, cinder must be compacted.

5. සෘජු බිත්ති පෙදරේරු:

(1) බොයිලේරු වටා ඇති සෘජු බිත්ති වර්තන ගඩොල්, තාප පරිවාරක ගඩොල් (හෝ තාප පරිවාරක තට්ටුව) සහ රතු ගඩොල් වලින් සමන්විත වේ. පෙදරේරු ඉදිකිරීමේ අනුපිළිවෙල වන්නේ ප්රථමයෙන් පරාවර්තක ගඩොල්, පසුව තාප පරිවාරක ගඩොල් (හෝ පේස්ට් පරිවාරක පුවරු හෝ ෆීල්) සහ අවසානයේ රතු ගඩොල් තැනීමයි. නිදසුනක් ලෙස, පරාවර්තක ගඩොල් සහ රතු ගඩොල් අතර උණුසුම් සන්ධිය පිරී ඇති විට, රතු ගඩොල් ස්ථර 3 සිට 4 දක්වා පිරවුම පිරවිය යුතු අතර, පිරවීම ඝන විය යුතුය.

(2) When building a straight wall, it must be placed at the corner of the furnace wall. The two ends of the straight section must be yarded with 2~3 layers of heads, and the horizontal line must be held. Build the mortar joints, leave the expansion joints in place, hang the vertical expansion joints asbestos ropes, and paste the asbestos panels on the steel frame facade before proceeding to masonry.

(3) The masonry method of straight wall masonry is: 1/2 brick thick wall adopts staggered joints and 1/2 brick length masonry; 1 brick and above thick wall adopts one top and one straight or lock package masonry method . The top or bottom layer of bricks of 1 brick and 1 brick thick masonry shall be top or side masonry.

(4) උදුන බිත්තියේ දෙපස වැඩ කරන පෘෂ්ඨයන් (ගඩොල් 1 හෝ ඊට අඩු ඝණකම සහිත බිත්ති හැර) ඇති විට, දෙපසම එකවර තැබිය යුතුය.

(5) The water-cooled wall header and the pipe side and the sliding support of the pipe side passing through the masonry shall not be fixed, and the special-shaped brick at the pull hook of the water-cooled wall shall not jam the ear plate of the water-cooled wall.

(6) පරාවර්තක ගඩොල් සහ රතු ගඩොල් එකලස් කරන විට, වර්තන ගඩොල් ගඩොල් උස තට්ටු 6 සිට 8 දක්වා ඉදිකරන විට, තිරස් දිශාව දිගේ සෑම මීටර් 1 සිට 1.5 දක්වා, 115mm දිග ​​ගඩොල් පිටත බිත්තියට දිගු කළ යුතුය. රතු ගඩොල්. ආතති ගඩොල් එකම ස්ථරයක් මත විසන්ධි කළ යුතු අතර, ඉහළ සහ පහළ ස්ථර එකතැන පල් විය යුතුය.

(7) රතු ගඩොල්වලින් පිටත බිත්තිය ගොඩනඟන විට, වාතාශ්රය සිදුරු සැපයිය යුතු අතර, වෙන් කර ඇති ඉඩ ප්රමාණය ඒකාකාර විය යුතුය. එකක් 2m2 පමණ වෙන් කර DN15~20 කළු යකඩ බටවලින් වළලා දැමිය හැක (නොවැළැක්විය හැකි අවස්ථාවලදී, වෙන්කර ඇති 60 × 120mm සිදුරු ක්‍රමය භාවිතා කරන්න). දැලක සහිත බොයිලේරු දැලක සේදීමේදී ස්ථාපනය කිරීමට පටන් ගනී; දැලක නොමැති බොයිලේරු මීටර් 1 ක් පමණ උන්නතාංශයක පිහිටුවීමට පටන් ගන්නා අතර, පරිවාරක මැහුම් වල ඉහළම ස්ථානය ද සකස් කළ යුතු අතර, උඳුන අවසන් වූ වහාම උෂ්ණත්වයට ඔරොත්තු දෙන ද්රව්යවලින් උදුන අවහිර කළ යුතුය.

6. The masonry of furnace wall openings, inspection holes, etc. adopts the masonry method that the refractory bricks of the inner wall penetrate to the red bricks of the outer wall (see Figure 2). When the upper covering design of the opening (hole) is required, the masonry shall be built according to the design requirements, and when the design is not required, the masonry shall be built in the following manner:

(1) The width of the hole (hole) in the wall is less than or equal to 450mm. If the span is not large, the solid platform method can be used to replace the small arch with a flat brick layer. The masonry method is shown in Figure 3. Each layer shall protrude ≤6mm from both sides into the opening until the opening is covered. The protruding length of each layer and the same layer shall be the same.

(2) The width of the opening (hole) in the wall ≤250mm can be covered by processing bricks. The masonry method is shown in Figure 4.

(3) The width of the hole in the wall> 450mm width shall be covered by arch-rotating masonry.

7. ආරුක්කු සහ සුරක්ෂිතාගාරයේ පෙදරේරු:

(1) ආරුක්කු සහ වෝල්ට් පෙදරේරු සඳහා අවශ්‍ය ටයර් අච්චු අරය සහ රේඩියන් නිෂ්පාදන ප්‍රමාණය සැලසුම් අවශ්‍යතා සපුරාලිය යුතුය. ටයර් අච්චුවේ පරතරය සැබෑ පරතරයට වඩා 20 ~ 30mm කින් අඩුය, මතුපිට පැතලි හා සිනිඳු වන අතර, එය විකෘති කිරීමේ හැකියාවකින් තොරව බර දරණ ද්රව්ය සහ ඉදිකිරීම් භාර ඇත.

(2) ආරුක්කු පෙදරේරු කිරීමට පෙර, ආරුක්කු පාදයේ ගඩොල් පිටුපස පෙදරේරු නිම කළ යුතු අතර, පෙදරේරු ඉදි කළ හැක්කේ පරීක්ෂණයෙන් සමත් වීමෙන් පසුව පමණි. ආරුක්කු පාදයේ ගඩොල්වලින් පසු තාප පරිවාරක පරාවර්තක ගඩොල් හෝ ගඩොල් ඇල්ගී පෘථිවි ගඩොල් තැනීමට අවසර නැත.

(3) Before the arch top is built, the arch toe beam and the frame column must be close together. Before laying the arch of the adjustable frame, the frame and the tie rods must be adjusted and fixed, and passed the inspection.

(4) Before the arch and vault masonry, first install the tire mold, check the elevation and position, fix it firmly, and then carry out pre-masonry. The purpose of pre-masonry is mainly to adjust the mortar joints and assemble the arch bricks. Model to meet the requirements of arch masonry quality and staggered joints. After the arch brick assembly arrangement meets the requirements, the brick faces are numbered according to the order of masonry and then removed, as shown in Figure 5. The masonry must be symmetrically built from the arch foot to the center at the same time. It is strictly forbidden to upside down the masonry.

(5) Unless there are special regulations, the arches and vaults shall be laid in staggered joints, and arches and vaults with different spans can be laid in rings. In the case of staggered joint masonry, when the length of the longitudinal joint is longer than 1 meter, the masonry must be drawn with a line.

(6) Lock bricks must be installed in the masonry of the arch and vault top. The depth of the built-in lock bricks is 2/3~3/4 of the thickness of the arch and vault top. As shown in Figure 6, the lock depth of the same arch must be the same. , When locking in, it should be from the tighter lock to the looser. In the wall, several adjacent arches and the lock bricks of the arch roof must be driven in at the same time to prevent the deformation of the adjacent arches.

(7) අගුළු ගඩොල් ඒකාකාරව හා සමමිතිකව බෙදා හරිනු ලැබේ. <3m සඳහා එක් අගුළු ගඩොල් තුළට ධාවනය කරන්න, සහ 3m සඳහා අගුළු ගඩොල් 3ක් ධාවනය කරන්න. එය අගුලු දමා ඇති විට ඔබට මිටියක් භාවිතා කළ හැකිය, නමුත් එය ලී පුවරුවකින් පිරවිය යුතුය.

(8) 1/3 ට වැඩි ඝනකමක් ඇති ගඩොල් භාවිතා කිරීමට හෝ විශාල පෘෂ්ඨය අගුලු ගඩොල් ලෙස කුඤ්ඤ හැඩයට සෑදීමට දිගු පැත්තක් කැපීමට අවසර නැත.

(9) For the processed bricks that are leveled on the upper part of the arch and the vault, the high temperature area or the surface of the external wall can be leveled by brick processing, and the low temperature area can be leveled by the same material of refractory concrete.

8. Upside-down masonry:

(1) පෙදරේරු උඩු යටිකුරු කරන විට ඇතුළත සහ පිටත චාප හැඩැති පුවරු දෙකක් සාදා ඇත. අභ්යන්තර චාප තහඩුව භ්රමණය වන අරය අනුව සාදා ඇත; පිටත චාප තහඩුව සෑදී ඇත්තේ අභ්‍යන්තර අරය සහ භ්‍රමණය වන ගඩොල් ඝනකම සමඟිනි.

(2) When building upside-down rotation, the bottom center line of the rotation is based on the arc-shaped slab, and the lower part is built. Generally, the length of the brick can meet 5~7 rotating bricks, then you can start to build upside down. Rotate, and then symmetrically build upside down from the center of the bottom of the upside down to both sides. Don’t hit too hard when starting to build to avoid shifting or loosening. After 5~7 bricks are built in the lower part of the inverted screw, the inner arc-shaped board is fixed on the surface of the rotating brick, and the bricks are symmetrically laid on both sides in the order of rotating the bricks and then processing the bricks. The masonry sequence is shown in Figure 7.

(3) When turning to 1/2 circle, the upper 1/2 adopts arch and vault masonry. When locking the bricks, turn the bricks around 1/2 of the upper vector height and then lock the bricks after the masonry is finished, as shown in Figure 8.

9. Masonry of hanging bricks and demolition of flame walls:

(1) ගඩොල් එල්ලීම සහ ගිනිදැල් බිත්ති ඉවත් කිරීම පහත් සිට ඉහළට, මැද සිට දෙපැත්තට ගොඩනැගීමේ මූලධර්මය අනුගමනය කරයි.

(2) එල්ලෙන ගඩොල් සහ ගිනිදැල් ඉවත් කිරීමේ බිත්ති ඉදිකිරීම සඳහා ගඩොල් සැකසීමට අවශ්ය වන විට, එල්ලෙන ගඩොල්වල එල්ලෙන සිදුරු නිෂ්කාශනය 5mm ට වඩා වැඩි නොවිය යුතු අතර, ගිනිදැල් ඉවත් කරන බිත්තිවල ඝණකම 90 ට නොඅඩු විය යුතුය. % එල්ලෙන ගඩොල්වල ප්රධාන බලය සහිත කොටස්වල ඉරිතැලීම් නොතිබිය යුතුය.

(3) සවි කරන බෝල්ට් සිදුරු සහිත විශේෂ හැඩැති ගඩොල් සඳහා, අත්හදා බැලීම් සඳහා ස්ථරයෙන් පළමු වියළි පේළිය සහ පයිප්පයේ බෝල්ට් සිදුරු වල පිහිටීම සලකුණු කිරීමෙන් පසුව, සවි කිරීම් බෝල්ට් වෑල්ඩින් කළ හැක. වර්තන ගඩොල් වලට හානි නොවන පරිදි පෙදරේරු අතරතුර ගෙඩි දැඩි ලෙස තද නොකළ යුතු අතර, බෝල්ට් සිදුරු පරාවර්තක කොන්ක්රීට් වලින් පිරවිය යුතුය.

10. The expansion joints of the furnace wall are left:

(1) උදුන බිත්තියේ විස්තාරණ සන්ධිවල පිහිටීම සහ ආකෘතිය සැලසුම් අවශ්යතා අනුව වේ. පළල සැලසුම් අවශ්යතා වලට වඩා කුඩා වීමට ඉඩ නොදෙන අතර, කැඩුණු ගඩොල් වැනි දෘඩ වස්තූන් සන්ධිවලට වැටීමට ඉඩ නොදේ. විස්තාරණ සන්ධියෙහි ඇසුරුම් සැලසුම් අවශ්යතා අනුව දැඩි ලෙස ඇසුරුම් කර ඇත. ඇස්බැස්ටෝස් කඹය භාවිතා කරන විට, ගිනිදැල් මතුපිටට පළමුවැන්න පරාවර්තක මඩ වල පොඟවා ගත යුතුය.

(2) ජල බිත්ති පයිප්ප, ඩවුන්කොමර්, ශීර්ෂ, මලාපවහන නල, බෙර, උෂ්ණත්වය මැනීමේ සිදුරු (නල) සහ බාල්ක ආදිය, බිත්තිය හරහා, විස්තාරණ සන්ධි ස්පර්ශක බිත්තියේ සහ වර්තන ගඩොල් උදුනේ සිරස් සහ තිරස් සම්බන්ධතා තබයි. බිත්තිය. ඇස්බැස්ටෝස් කඹයකින් සුළං කිරීම වඩා හොඳය.

(3) උදුන බිත්තියේ විස්තාරණ සන්ධිය හැර යාමේ ක්‍රමය:

①. The method of retaining expansion joints at the corners is shown in Figure 9(a): the method of leaving the junction of 1/2 brick and 1 brick; Figure 9(b): the method of leaving the junction of 1 brick and 1 brick.

②. කඩා දැමීමේ බිත්තියේ සහ උඳුනේ බිත්තියේ කෙළවර දෙකේ සන්ධිස්ථානයක විස්තාරණ සන්ධි සැකසීමේ ක්රමය රූප සටහන 10 හි දැක්වේ.

③. උදුන බිත්තියේ මැද සිරස් ප්‍රසාරණ සන්ධි රැඳීමේ ක්‍රමය රූප සටහන 11 හි දැක්වේ.

④. උදුන වහලයේ සන්ධිස්ථානයේ සහ එල්ලෙන ආරුක්කුවේ සහ උදුන බිත්තියේ කෙළවරේ විස්තාරණ සන්ධි සැකසීමේ ක්‍රමය රූප සටහන 12 හි දැක්වේ.

⑤ උදුන බිත්තියේ තිරස් විස්තාරණ සන්ධි සාමාන්යයෙන් විශේෂ හැඩැති ගඩොල්වලින් සාදා ඇත. විශේෂ හැඩැති ගඩොල් නොමැති නම්, 13 රූපයේ දැක්වෙන ක්රමය පෙදරේරු සඳහා භාවිතා වේ. තිරස් විස්තාරණ සන්ධිය තැබීමේදී, ඇස්බැස්ටෝස් කඹය සම්පීඩනය කළ යුතුය; තිරස් ප්‍රසාරණ සන්ධියට ඉහළින් ඇති පරාවර්තක ගඩොල්වල උස මීටර 1 නොඉක්මවිය යුතු අතර, ඇස්බැස්ටස් කඹය සම්පීඩනය වීම සහ උදුන බිත්තිය ඇලවීම වැළැක්වීම සඳහා පරාවර්තක ගඩොල් සහ රතු ගඩොල් විකල්ප වශයෙන් ඉහළ යනු ඇත.

(4) සිරස් ප්‍රසාරණ සන්ධිය පෙදරේරු සඳහා රේඛාව එල්ලා ඇත, වැරදි දත 3mm ට වඩා වැඩි නොවේ, සහ ප්‍රසාරණ සන්ධියේ ඇති ඇස්බැස්ටස් කඹය ප්‍රසාරණ සන්ධියේ ඉතිරි පළලට වඩා 3~5mm කින් තරමක් විශාල වන අතර එය තද කර ඇත. පෙදරේරු අතරතුර එම අවස්ථාවේදීම.

11. Refractory bricks and thermal insulation bricks are not allowed to wet the bricks, and the red bricks must be watered until the outside is dry and the inside is saturated before the red bricks are built.

12. It is not allowed to process bricks or walk on the masonry, and it is not allowed to face the processing surface of the bricks to the flame surface.

13. පරාවර්තක ගඩොල් සහ රතු ගඩොල් මතුපිට ඒකාබද්ධ කළ යුතුය. සංවහන නල මිටි සාන්ද්‍රණය කර ඇති අතර බොයිලේරු උපාංග අවහිර කර ඇති ස්ථානවල අළු කන් පෙදරේරු සමඟ සීරීමට ලක් කළ යුතුය.

IMG_256

ඉදිකිරීම් බොහෝ විට සමාගම් නොසලකා හැරීමට නැඹුරු වන සබැඳියකි. ඔවුන් හැම විටම සිතන්නේ හොඳ නිෂ්පාදන සහ හොඳ මෝස්තර උඳුනේ සේවා කාලය සහතික කළ හැකි බවයි. ජාතික ප්‍රමිතියට අනුව, භ්‍රමණ උදුන ඉදිකිරීම පිළිබඳ දැඩි රෙගුලාසි පහත පරිදි වේ: