Summary of Inspection and Repair of Induction Melting Furnace to Avoid Major Accidents

Summary of Inspection and Repair of Induction Melting Furnace to Avoid Major Accidents

Maintenance and repair items Maintenance and repair content Maintenance time and frequency Remark
furnace

 

 

lining

 

 

Whether the furnace lining has cracks

Check for cracks in the crucible Before the furnace starts every time If the crack width is less than 22 mm , it is not necessary to repair it when chips and other things will not be embedded in the crack, and it can still be used. Otherwise, it needs to be patched before it can be used
Repair of taphole Observe whether there are cracks at the junction of the side avoiding furnace lining and the tap hole At the time of tapping If cracks appear, repair them
Furnace lining repair at furnace bottom and slag line Visually observe whether the furnace lining at the bottom of the furnace and the slag line is locally corroded After casting If there is obvious corrosion, it needs to be repaired
feel

 

answer

 

String

 

lock up

 

 

Visual inspection

(1 ) Whether the insulation part of the coil is bruised or carbonized

(2 ) Is there any foreign compound attached to the surface of the coil?

(3) Whether the insulating backing plate between the coils protrudes

(4) Whether the assembly bolts of the tightening coil are loose

1 time / day

1 time / day

1 time / day

1 time /3 months

Purge with compressed air in the workshop

 

 

Tighten the bolts

Coil compression screw Visually check whether the coil compression screw is loose 1 time / week  
rubber tube (1) Whether there is water leakage at the rubber tube interface

(2 ) Check whether the rubber tube is cut

1 time / day

1 time / week

 
 

Coil anti-corrosion joint

Remove the rubber hose and check the corrosion degree of the anti-corrosion joint at the coil end 1 time /6 months When this anti-corrosion joint corrodes more than 1/2 , it needs to be replaced with a new one. Usually changed every two years
Cooling water temperature at coil outlet Under the conditions of rated molten iron volume and rated power, record the maximum and minimum values ​​of the cooling water temperature of each branch of the coil 1 time / day  
Dust removal The compressed air in the workshop blows away the dust and molten iron splashes on the surface of the coil 1 time / day  
Pickling Pickling of sensor water pipes 1 time /2 years  
Can

scratch

sex

guide

String

 

 

Water-cooled cable

(1 ) Whether there is electricity leakage

(2 ) Check whether the cable is in contact with the furnace pit

(3 ) Record the temperature of the cable outlet water under the rated power

(4 ) Preventive measures taken to prevent accidents

(5 ) Check whether the connecting bolts at the terminals are discolored

1 time / day

1 time / day

1 time / day

1 time /3 years

1 time / day

According to the number of tilts, determine the life of the water-cooled cable as three years, and need to be replaced after three years. If the bolt changes color, re-tighten it
Maintenance and repair items Maintenance and repair content Maintenance time and frequency Remark
furnace

 

 

 

 

cover

 

 

Dry cable

(1) Eliminate dust on the insulating bakelite busbar splint

(2 ) Check whether the chain hanging the busbar splint is broken

(3 ) Whether the copper foil of the bus bar is disconnected

1 time / day

 

1 time / week

1 time / week

When the area of ​​the disconnected copper foil accounts for 10% of the conductive area of the bus, it needs to be replaced with a new bus
Refractory castable Visually inspect the thickness of the refractory pouring layer of the furnace cover lining 1 time / day When the thickness of the refractory castable remains 1/2 , the furnace cover lining must be rebuilt
 

Oil pressure furnace cover

 

(1 ) Whether there is leakage in the sealing part

(2 ) Leakage of piping

(3 ) Leakage of high pressure pipe

1 time / day

1 time / day

1 time / day

If yes, repair it

Swap

High pressure pipe (1 ) Whether there are traces of molten iron scald on the high-pressure pipe, etc.

( 2 ) To ensure safety, exchange

1 time / week

1 time /2 years

 
 

Add lubricating oil

(1 ) Manual type: Furnace cover fulcrum part

(2) Electric type: sprocket drive bearing for shaft adjustment chain for furnace cover wheel

(3 ) Hydraulic type: guide bearing

   
pour

 

move

 

Oil

 

Cylinder

Lower bearing and high pressure pipe of oil cylinder (1 ) Whether there are traces of molten iron scald on the bearing part and the high-pressure pipe

(2 ) Oil leakage

1 time / week

 

1 time / month

 

 

Remove the cover for inspection

 

Cylinder

(1 ) Whether there is leakage in the sealing part

(2) Abnormal sound

1 time / day

1 time / day

When tilting the furnace, observe the cylinder block

When making sounds such as knocking on the cylinder, the bearings are mostly out of oil

 

Tilting furnace limit switch

(1) Action check

Press the limit switch by hand, the oil pump motor should stop running

(2 ) Whether there is molten iron splashing on the limit switch

1 time / week

 

1 time / week

 
Add lubricating oil All fuel ports 1 time / week  
High pressure control

cabinet

 

Appearance inspection inside the cabinet

(1) Check the operation of each indicator light bulb

(2 ) Whether the parts are damaged or burned out

(3 ) Clean the pan with compressed air in the workshop

1 time / month

1 time / week

1 time / week

 
 

Circuit breaker vacuum switch

(1 ) The cleaning pass is a contact

The vacuum tube is milky white and fuzzy, the vacuum degree is reduced

(2 ) Measuring electrode consumption

1 time /6 months

 

 

1 time / month

 

 

If the gap exceeds 6 mm, replace the vacuum tube

Main switch cabinet  

 

 

 

Electromagnetic air switch

(1 ) Roughness and wear of the main contact

 

 

 

(2 ) Come on

 

(3 ) Whether the fire extinguishing board is carbonized

1 time /6 months

 

 

 

1 time /6 months

 

1 time /6 months

When the roughness is severe, grind it with a file, sand skin, etc.

When the contact wear exceeds 2/3 , replace the contact

Add spindle oil to each bearing and connecting rod

Use sanding to remove the carbonized part

 

Maintenance and repair items Maintenance and repair content Maintenance time and frequency Remark
Main switch cabinet   ( 4) Dust removal 1 time / week Clean with compressed air in the workshop, and wipe the dust on the insulators with a cloth
Insulation resistance Use a 1000 volt megger to measure the main circuit and greater than 10M Ω    
Converter switch  

Transfer switch

(1) Measure insulation resistance

(2 ) Rough switch main connector

(3) The main circuit connecting bolts are loose and overheated

1 time /6 months

1 time / month

1 time /3 months

Between the conductor and the ground, use a 1000 volt megohmmeter to measure greater than

1M Ω

Polish or exchange

control

 

system

 

cabinet

 

tower

Appearance inspection inside the cabinet (1) Whether the components are damaged or burned out

(2 ) Whether the components are loose or fall off

1 time / week

1 time / week

 
 

Action test

(1 ) Check whether the indicator light can be on

(2 ) Alarm circuit

Action should be checked according to alarm conditions

1 time / week

1 time / week

 
Dust removal in the cabinet Clean with compressed air in the workshop 1 time / week  
 

Contactor for auxiliary machine

(1) Check the roughness of the contact, if the roughness is severe, polish it smoothly with fine sand

(2) Exchange contacts

Replace the contacts when they are badly worn

1 time / 3 months

 

1 time /2 years

Especially the frequently used contactor for tilting furnace lid
Transformer reactor Check appearance (1 ) Whether there is oil leakage

(2 ) Whether the insulating oil is added to the specified position

1 time / week

1 time / week

 
Transformer and reactor temperature Check the daily thermometer indication, which is lower than the specified value 1 time / week  
Sound and vibration (1 ) Usually check by listening and touching

(2 ) Instrument measurement

1 time / week

1 time / year

 
Insulating oil withstand voltage test Should meet the specified value 1 time /6 months  
Tap changer (1 ) Check whether the tap changeover is offset

(2 ) Check the roughness of the tap adapter

1 time /6 months

1 time /6 months

Use fine sand to polish and replace it with a new one when it is severely rough
Capacitor bank Check appearance (1 ) Whether there is oil leakage

(2 ) Whether each terminal screw is loose

1 time / day

1 time / week

If slack occurs , the terminal part will be discolored due to overheating
Exchange capacitor contactor

 

 

Dust removal

(1) The roughness of the contact

1 ) Use a file to smooth the rough part

2 ) When the wear is severe, replace the joint

(2 ) The contact temperature rises

Use compressed air in the workshop to clean the insulators with a cloth

1 time /6 months

 

 

1 time / week

1 time / week

 

 

At least 1 time / month

The temperature around the capacitor bank Measure with mercury thermometer 1 time / day Ventilated , so that the surrounding temperature does not exceed 40 deg.] C
Hydraulic device  

 

Hydraulic oil

(1 ) Whether there is any change in the color of the oil at the height of the oil level displayed by the oil level gauge

(2) Check the amount of dust in the hydraulic oil and the quality of the oil

(3) Measuring temperature

1 time / week

 

1 time /6 months

 

1 time /6 months

If the oil level drops , there is a leak in the circuit

When the quality is poor , change the oil

pressure gauge Whether the tilting pressure is different from usual, when the pressure drops, adjust the pressure to the normal value 1 time / week